Rollercoaster crashes are usually caused by a number of factors. They include the ride's operating mode, the design of the ride, the speed of the ride's car at the point of impact and the ride breaking down.
These are made to order and lead time is 2 weeks.
Weight
350 gsm
Material
85% Organic ringspun combed cotton, 15% Recycled polyester